Trailer as Received

When we received the storage container we knew there was going to be a lot of work ahead of us. With a full assessment and timeframe we got to work and began with the removal of the flooring.
This was the flooring before we bargain gutting the interior out. You can see the major transformation on the lower right corner photo with new flooring and walls that can withstand the elements.

Removal of Wood Paneling

With the manpower we had we were able to remove the walls which were originally wood and exposed a reusable and recycle material, aluminum.

Cleaning Debris

Repairing Floor

The floors were not in the nest condition, so we first need to remove the flooring to expose and asses the underlying materials.
Had custom metal sheets sized and cut for our unit.
Finally we laid the flooring down one sheet at a time.
Floor is finished and sparkling.

Repairing the Walls

Building the Solid Seperator

Solid Separator Tanks

Coating Floor & Roof

pH Tank

Welding Racks

Building PLC

Welding Racks

Worm Bed Shelves

INSTALLING WORM BED SHELVES

MOBILE UNIT DRAWINGS

Fabricating Bioreactor

Installing Bioreactor

Pumping Worm Bed Shelves

ELECTRICAL SETUP

BUILDING & INSTALLING DOOR

MORE TO COME!!!

Created By
Richard Carreon
Appreciate

Made with Adobe Slate

Make your words and images move.

Get Slate

Report Abuse

If you feel that this video content violates the Adobe Terms of Use, you may report this content by filling out this quick form.

To report a Copyright Violation, please follow Section 17 in the Terms of Use.