Wis Hwy 42 Resurfacing Project Detours, road closures & business information

One of the major long-term projects in town is the WIS 42 Resurfacing Project, scheduled for construction in 2018/2019. The total project extends from Bluff Lane in Gibraltar, through the village of Ephraim, and up to Country Walk Drive in Sister Bay, with the Town of Gibraltar's Streetscape and Lighting Design Project (among other projects) corresponding with the portion of the Hwy 42 resurfacing project that runs through town.

An overview of the project includes:

  • Extend sidewalk, curb, gutter, and storm sewer in Gibraltar to improve pedestrian safety and access to Gibraltar Schools, Door County Auditorium, and the Northern Door YMCA.
  • Replacement and modifications of the storm sewer outfall located off Shore Road within Peninsula State Park.
  • Replacement and modifications of the storm sewer outfall located off Shore Road within Peninsula State Park.
  • Repair/replace deteriorated storm sewer and cross drain pipes
  • Miscellaneous repairs to curb and gutter, pedestrian curb ramps, storm sewer inlets and manholes, and sidewalk

Finding Information about the Hwy 42 project is as easy as 1...2...3

1. Public Meetings. The WIS Department of Transportation (Wis DOT) hosted a public involvement meeting last June to provide residents with information about the project and gather public input. This handout reviews the information covered at the public Involvement meeting.

2. Local Business Information. The Wis DOT "In This Together" program features a workbook, case studies, and a wealth of information on how to maintain a thriving business during a major construction project. Download the "In This Together" workbook or review the many case studies and promotional samples to see how other businesses have successfully navigated and overcome road construction challenges.

3. Road closures, detours, and project timelines are easily accessible on the Wis DOT Hwy 42 project website as well as printable maps and additional handouts that outline project details:

- Gibraltar Sidewalk Extensions Map

- Traffic Impacts & Detours Schedule (see below)

- School Median Drawing

- YMCA Median Drawing

- Traffic Control Handouts (Road Closures and Detours)

Credits:

Created with images by alles - "tractor grader road works construction wheels diesel"

Report Abuse

If you feel that this video content violates the Adobe Terms of Use, you may report this content by filling out this quick form.

To report a Copyright Violation, please follow Section 17 in the Terms of Use.