FT Andover Storage Portfolio Improvements 2015-2016

FT Andover continues to reinvest excess proceeds from Operations into expansion and capital improvement projects. Here's a sampling of some of the projects completed to date.

FTPA Storage Chattanooga, LLC - Chatt, TN

Converted RV parking into 25,000 sf outdoor drive up units. Converted unutilized space to income producing indoor units. Moved and built new office to user friendly location in front of the facility and added automatic access gate with keypad entry.

Total Cost $1.325M

FTPA Storage Germantown, LLC - Philadelphia PA

Painted building and made masonry repairs including blocking-up window openings. Built new office replacing unusable existing space. Added keypad entry for additional security, made building compliant with fire code regulations, and replaced leaking roof. Sealed first and second floor walls to prevent heat loss, and reworked heating system to regulate interior temperatures and save on utility costs.

Total Cost $446K

FTPA Storage Kensington, LLC - Philadelphia PA

Water proofing, mold remediation and drainage repairs to enable full utilization of the basement adding an additional 100 units to the total inventory. Made facility compliant for fire exits, stairways and safety lighting codes. Sealed exterior windows to prevent both water seepage and for greater insulation. Painted building.

Total Cost $584K

FTPA Storage Lancaster, LLC - Philadelphia PA

Remolded the front of the building, added life safety requirements and painted the building.

Total Cost $140K

FTPA Storage Miami, LLC - Miami, FL

Corrected third floor leakage in a large portion of units by creating a second wall system. Repaired lighting deficiencies and painted the building.

Total Cost $42K

FTPA STORAGE HWY 301, LLC - Hope Mills, NC

Expanded RV parking and built a 12,000 sf climate control building.

Total Cost $375K

FTPA Storage Ft Pierce, LLC - Fort Pierce, FL

Remodeled office, painted the building and repaired 40 exterior units that were unrentable because of water intrusion. Repaved & re-striped parking lot as needed for tenants. Made facility exterior ADA compliant.

Total Cost $223K

FTPA Storage Raleigh, LLC - Raleigh,N.C

Converted 25,000 sf of industrial space into self storage. Remodeled office.

Total Cost $566K

FTPA Storage Neptune, LLC - Neptune, N.J

Installed new gate, fence and sign & paved/re-striped parking lot. Made office ADA compliant.

Total Cost $236K

Report Abuse

If you feel that this video content violates the Adobe Terms of Use, you may report this content by filling out this quick form.

To report a Copyright Violation, please follow Section 17 in the Terms of Use.