Breaking Solutions, Inc. ("BSI") was hired to expedite the demolition of a precast facade as part of the Hospital for Special Surgery's expansion into Westchester County. BSI designed and engineered the demolition sequence and created site safety plan. Each precast panel weighs more than 50,000lbs and extends through the top 2 floors of the building.
Now the demo begins