Internal Power Failure 24/7 nationwide service center

Academy Electrical Contractors were called in Monday July 23 at 9 AM to look at a tenant in a commercial office space in Paramus due to an internal power failure.

After looking at the problem we came up with a solution. It consisted of the following: one 200 KW Diesel generator supplying 480 Volt three phase power, 1,750 feet of cam-lok cable, five tails to tie it in to the distribution panel on the second floor, and for safety eight cable ramps for the pedestrian traffic.

480 Volt three phase power. Tie it in to the distribution panel on the second floor.

For safety eight cable ramps for the pedestrian traffic.

1,750 feet of cam-lok cable

Temporary cables run through office to access the temporary generator outside. For safety a cable ramp was placed at the isle.

Dan O'Brien

From the time we received approval from the customer and the building super till the time all the power was restored was under three hours.

Nice conduit work!.
(201) 666-7680

AcademyElectrical.com

Report Abuse

If you feel that this video content violates the Adobe Terms of Use, you may report this content by filling out this quick form.

To report a Copyright Violation, please follow Section 17 in the Terms of Use.