A Road of Uncertainty Finishing the job

Unfinished Interstate 95 overpass that will connect to the Eastbound lanes of John Turner Butler Boulevard
Work remains on a second overpass heading west that will connect with Interstate 95

.

Mounds of dirt and construction items show just how much work is left to be done before the project is completed.
A fallen detour sign shows points into the direction drivers should go to navigate around construction.
Construction cones help drivers navigate through open and closed roads at busy interchange.
A large barricade separates Eastbound and Westbound traffic while crews work.

Under this overpass, drivers will be able to directly connect to Philips Highway. The road still needs to be paved.
A wider look at where the overpass is being built.
Several roads are shut down until crews finish construction in 2018.
FDOT crews estimate interchange will be completed by 2018.

Credits:

Photo Credits: Tywanna Pryor 

Made with Adobe Slate

Make your words and images move.

Get Slate

Report Abuse

If you feel that this video content violates the Adobe Terms of Use, you may report this content by filling out this quick form.

To report a Copyright Violation, please follow Section 17 in the Terms of Use.